(630) 782-0180

Courthouse Square25 East Liberty Drive

« Back to portfolio
Contractor
Focus Development
Contract Value
$2,700,000
Owner
Focus Courthouse, LLC
Architect
Antunovich Associates
Year
2007

What could we do for your next project?

Let's talk
50 unit 6 story Load-Bearing Cold-Formed Metal Frame structure over 2 levels of precast concrete parking. A light-weight framing structure consisting of 4,800 LF on-site fabricated load-bearing wall panels & 70,000 SF Dietrich Metal Framing TradeReady Floor Joists with USG Fortacrete non-combustible structural panels were used to provide 2 - hour rated UL assemblies. The exterior was clad in 30,000 SF GP DensGlass Gold Exterior Sheathing & Dupont Tyvek CommercialWrap Weather Barrier. The interor was constructed from 180,000 LF Dietrich Metal Framing UltraSteel Framing Members with 425,000 SF GP ToughRock Gypsum Board, 20,000 SF GP DensArmour Plus Mold-Resistant Drywall, and 25,000 SF GP DensGlass Ultra Mold-Resistant Shaftliner.